Polaris Pro XP & Turbo R Paragon-43 280 Turbo Upgrade System

Pro XP & Turbo R Paragon-43 280 Turbo Upgrade System

Vehicles
Polaris RZR
Legacy SKU
604FP0049
Revision
Rev_011124

Before you start

Note

Expect 24–48-hour delay from the time you request a tune to when the file is enabled. Please create your Maptuner/CodeShooter account before starting the project.

This is a high-performance upgrade! Although we have gone through great lengths to build safety into the upgrade turbo system, the fact is installing any upgrade / turbo system requires care in both operation and installation. Poor fuel, improper setup or any number of things that are done incorrectly can damage your engine!

  • You have likely voided the sound and exhaust emission standards of your country if applicable.
  • This upgrade is intended for OFFROAD and RACING use only.
  • This is a performance upgrade which will VOID your engine warranty especially if installed incorrectly or operated without regard to your instruments.
  • The fuel requirements must be adhered to. Poor fuel can destroy an engine in seconds.
  • Evolution Powersports bears no responsibility for damage caused to your vehicle by the installation of EVP products. The warranty on big turbo kits is 30 days from the date of purchase. Evolution Powersports, at its discretion will determine whether a part meets the warranty requirements. In no case is there any warranty from EVP for your vehicle or vehicles drivetrain. Although we have been careful to supply you with the highest quality parts possible, we assume no liability for damage to the vehicle or personal injury from installing or using any of our products.
  • The installation of this kit is technical and mechanical in nature with many opportunities to make mistakes – mistakes that can be very costly. If you are not qualified to install this kit, bring your vehicle to one of our qualified installation centers to do the installation.
  • This kit will make your vehicle faster, climb higher and accelerate more quickly and take a longer distance to brake than a stock tuned vehicle. If you are not capable of controlling the vehicle with the added performance, do not install the kit.
  • High boost is hard on spark plugs – they must be changed frequently. If you experience misfire issues – Gap and replace the spark plugs.
  • A full exhaust and clutching are required for this kit and can be purchased separately.
  • Do not ever allow a child or an unqualified driver to operate this vehicle.

In the box

Parts and tools

Parts Included in Paragon 43-280 Turbo Upgrade System

100FP0020XP Turbo/S & Pro XP & Turbo R Silicone Charge Tube Kit, Black
100FP0117XP Turbo/S & Pro XP & Turbo R Blow Off Valve 2.0 (BOV) Kit
203FP0034Pro XP & Turbo R V-Flow Intake Kit, Black
500FP00132021+ Pro XP High Pressure Fuel Pump Kit
502FP0016XP Turbo/S / Pro XP 1700CC Injector Set of 2
604FU00542019-2021 XP Turbo/S & Pro XP EVAP Paragon 43/42 Blue Turbocharger Assembly
604FP0025Pro XP & Turbo R Paragon Install Kit
707FP0003Maptuner X for Polaris
800FP0001XP Turbo/S XR Series EVP Head Stud Kit
705FP0030RZR 4 Bar MAP Sensor Kit
804FP0169XP Turbo/S Spark Plug Set Of 2, Brisk
804FP0190Pro XP and Turbo R TPR Oil Breather Kit, Raw

Parts Included Pro XP/ Turbo R Paragon Install Kit

953RU0078Hps 3/8" Silicone Water Hose7.5
953RU0078Hps 3/8" Silicone Water Hose15
953RU012722mm Pinch Clamp4
953RU0197Reduction T 1/2" Barb x 3/8” Barb1
953RUXXXX3/4" to 5/8" Barb Reducer1
953RU01503/4" Heater Hose3
953RU015130.1MM Pinch Clamp2
001FU0133Paragon Maptuner Power Flash1
LevelTunesMax Boost (psi)Spark Plug GapSpringWaste Gate (psi)Engine HP
P43-28091, 100, MS109, E8519, 25, 29, 29.016 - .018Brown/Purple8280 (E85)

Required Parts (Sold Separately)

  • EVP or other Full Turbo Back Exhaust System
  • AFR reading (CodeShooter)
  • Boost reading (CodeShooter)

Procedure

TURBO REMOVAL

  1. Step 1

    Remove the bed (4) T40 torx, both seats (rear two seats in a four seater), both firewall panels.

  2. Step 2

    Remove the turbo and exhaust heat shields using a 10mm socket.

    Remove the turbo and exhaust heat shields using a 10mm socket.
    Remove the turbo and exhaust heat shields using a 10mm socket.
  3. Step 3

    Remove the charge tube using a 11mm socket to loosen both clamps on the turbocharger and throttle body. Disconnect the MAP sensor and blow off valve/ boost recirculating valve. (this vehicle already has an EVP charge tube and BOV).

  4. Step 4

    Remove the V-Flow using a 11mm socket to loosen both clamps on the turbocharger and airbox. Unplug the MAF sensor.

    Remove the V-Flow using a 11mm socket to loosen both clamps on the turbocharger and airbox.
  5. Step 5

    Remove both upper and lower turbo heat shields using a 10mm socket.

    Remove both upper and lower turbo heat shields using a 10mm socket.
    Remove both upper and lower turbo heat shields using a 10mm socket.
  6. Step 6

    Spray the (4) screws holding the exhaust to the turbocharger with penetrating oil. Do this a minimum of three times while you continue working.

    Spray the (4) screws holding the exhaust to the turbocharger with penetrating oil.
  7. Step 7

    Drain the coolant reservoir, first pull the pressure cap off releasing any built-up pressure. Pull the bottom left hose off and catch the coolant in a bucket.

  8. Step 8

    Remove the (4) M6 allen bolts holding the exhaust system to the turbocharger.

  9. Step 9

    Remove the turbocharger bracket. Remove the top bolts holding the bracket to the turbocharger. The 10mm head circled below has a 13mm nut on the back side. You will need a 13mm open end wrench. On the bottom of the turbocharger bracket you need to loosen (6) 15mm bolts. Only remove one bolt circled in red below on both sides.

    Remove the turbocharger bracket.
    Remove the turbocharger bracket.
  10. Step 10

    Remove the oil feed line from the turbocharger using a 13mm socket. Keep the banjo bolt and copper washers. Use a 15mm wrench to remove the spacer bolt holding the bracket to turbocharger.

    Remove the oil feed line from the turbocharger using a 13mm socket.
  11. Step 11

    Remove the oil feed line from the turbocharger bracket, use a T25 socket. Tilt the bracket towards the front of the vehicle and remove.

  12. Step 12

    Remove and label the wastegate and boost reference vacuum lines from the turbocharger.

    Remove and label the wastegate and boost reference vacuum lines from the turbocharger.
  13. Step 13

    Pinch off the coolant lines going to the oil cooler. Below the “T” fitting. Remove the coolant line from the “T” going to the turbocharger. Keep the other end connected to turbo.

    Pinch off the coolant lines going to the oil cooler.
  14. Step 14

    Remove the oil drain hose from the oil drainpipe.

  15. Step 15

    Remove the coolant feed line from the reservoir to turbocharger. (Figure 12)

    Remove the coolant feed line from the reservoir to turbocharger.
    Fig. 12
  16. Step 16

    Remove (4) 13mm nuts holding the turbocharger to the block. Remove (2) M6 Allen screws holding the turbocharger to the block. Remove turbocharger.

    Remove (4) 13mm nuts holding the turbocharger to the block.
  17. Step 17

    With the new turbocharger on the bench, double check all shipping plugs are removed from the oil drain pipe and no debris in the turbine or compressor housings.

  18. Step 18

    Remove the OEM coolant “T” coming from the oil cooler and install supplied “T” fitting. Reuse the self-tightening clamps for the new barb.

    Remove the OEM coolant “T” coming from the oil cooler and install supplied “T” fitting.
  19. Step 20

    On the turbo support bracket, you will need to grind a larger radius around the top support hole. See photo below where the mark is located.

    On the turbo support bracket, you will need to grind a larger radius around the top support hole.
    On the turbo support bracket, you will need to grind a larger radius around the top support hole.

Procedure

Turbocharger Installation

  1. Step 21

    Install the new turbocharger, if the head pipe gasket is damaged you must replace it. Torque specifications are below for turbo.

    Torque nuts to 26 ft/lb (35Nm). Torque screws to 17 ft/lb (23Nm)
    Torque nuts to 26 ft/lb (35Nm). Torque screws to 17 ft/lb (23Nm)
  2. Step 22

    Install the supplied 26.0” water hose line from the “J” coolant fitting by the wastegate and connect to the “T” fitting. Route the coolant hose clockwise around the turbocharger and down to the “T” fitting. Use pinch clamps to secure. Connect the OEM oil drain hose to the turbo.

    Install the supplied 26.0” water hose line from the “J” coolant fitting by the wastegate and connect to the “T” fitting.
  3. Step 23

    Install the supplied 15.0” water hose line from the “J” coolant fitting to coolant reservoir tank. Use supplied 22mm pinch clamps to secure.

    Install the supplied 15.0” water hose line from the “J” coolant fitting to coolant reservoir tank.
  4. Step 24

    Reinstall the turbocharger support bracket, push against the turbocharger making sure you ground enough off. Tighten the lower support bolts (42 ft/lbs) and reinstall top hardware. Screw in the spacer bolt using a 15mm wrench. Screw the 10mm head screw into the spacer bolt. Reinstall the turbo oil feed line reusing the banjo bolt and (2) copper washers. Torque banjo to 33 ft/lbs.

    Reinstall the turbocharger support bracket, push against the turbocharger making sure you ground enough off.
    Reinstall the turbocharger support bracket, push against the turbocharger making sure you ground enough off.
  5. Step 25

    Secure the oil feed line and coolant hoses to the turbocharger support bracket. Remove the coolant clamps from the vehicle.

  6. Step 26

    Reinstall the wastegate and boost reference vacuum hoses to the new turbocharger. Reinstall the 3.0” exhaust to the turbocharger. If the exhaust gasket is not useable, replace it. If you are installing new exhaust, please find those instructions on our website. Place anti seize on the threads and torque to 18 ft/lbs.

Procedure

Injector Removal

  1. Step 1

    With the engine cold, spray the injector valleys and fuel rail with parts cleaner. Use compressed air to finish. If you don’t do this step and you remove the injectors, debris will fall into the engine and plenum.

  2. Step 2

    Remove the plastic safety retainer on the fuel rail. Remove the fuel line from the fuel rail (red arrow). Fuel may seep out of the fuel rail, and have rags close by.

  3. Step 3

    Remove the injector electrical adaptors (green arrow) and loosen the (2) fuel rail screws (yellow arrow). Remove the fuel rail with injectors attached.

    Remove the injector electrical adaptors (green arrow) and loosen the (2) fuel rail screws (yellow arrow).
  4. Step 4

    Remove the old injectors and place in a plastic bag. Use dielectric grease on the O-rings on the new injectors and slide into the fuel rail.

    Use dielectric grease on the O-rings on the new injectors and slide into the fuel rail.
  5. Step 5

    Reinstall the fuel rail with supplied hardware. Place the spacers between the fuel rail and plenum. Torque down to 7 ft/lb.

    Reinstall the fuel rail with supplied hardware.
    Note

    the injectors will still move when torqued down, this is correct. They are sealed.

  6. Step 6

    Reinstall the fuel hose to the fuel rail. Make sure the fuel line is all the way on.

    Reinstall the fuel hose to the fuel rail.

Procedure

Head Stud Installation

  1. Step 1

    Pinch off all coolant lines going to the engine and valve cover. Remove the coolant reservoir cap if you haven’t done that already. Once all coolant lines are pinched off remove the valve cover coolant line.

    Pinch off all coolant lines going to the engine and valve cover.
    Pinch off all coolant lines going to the engine and valve cover.
    cap the barb off with a silicone cap.
    Caution

    there may be pressure behind this hose, cap the barb off with a silicone cap.

  2. Step 2

    Disconnect the spark plug coil packs and loosen the coil packs with a 8mm socket. Pull the coil packs out of the valve cover.

  3. Step 3

    Remove the (4) valve cover screws using a T-40 torxs. Keep the rubber gromets. Remove the valve cover and gasket.

    Remove the (4) valve cover screws using a T-40 torxs.
  4. Step 4

    Remove the crankcase position sensor using an 8mm socket. Find TDC and slide the cam locking tool into place. Tool Number: PU-50563-1. To double check TDC you can find a (+) sign looking through the crankcase position sensor port.

    Find TDC and slide the cam locking tool into place. Tool Number: PU-50563-1.
    To double check TDC you can find a (+) sign looking through the crankcase position sensor port.
  5. Step 5

    Remove the cam chain tensioner using a M6 Allen. Check gasket for any tears.

  6. Step 6

    Remove the (2) retaining bolts holding the top guide in place, using a 8mm socket.

    Remove the (2) retaining bolts holding the top guide in place, using a 8mm socket.
  7. Step 7

    Clean the cam sprockets and chain. With a sharpie make (2) marks on each gear and chain for installation purposes.

    Clean the cam sprockets and chain.
  8. Step 8

    Place a 22mm wrench on the intake cam, spin the clutch to release pressure off the valves while loosening the intake cam sprocket. Remove the sprocket once hardware is removed.

    Place a 22mm wrench on the intake cam, spin the clutch to release pressure off the valves while loosening the intake cam sprocket.
  9. Step 9

    Loosen both camshaft carriers using a 8mm socket. Remove carriers and cam shafts from the engine. Zip tie the cam chain up to the bed mount so the chain doesn’t come off the crank.

    Loosen both camshaft carriers using a 8mm socket.
    Zip tie the cam chain up to the bed mount so the chain doesn’t come off the crank.
  10. Step 10

    Remove one head bolt and replace it with a stud at a time so the cylinder head never has more than one bolt/stud loose at a time. Lather both ends of the stud with supplied ARP assembly lube. Hand tighten the stud until it bottoms out. Place assembly lube on both sides of the washer, place the washer on the stud. Finger tighten the nut onto the stud and torque to 50 ft/lbs. See torque sequence and specifications below.

    Remove one head bolt and replace it with a stud at a time so the cylinder head never has more than one bolt/stud loose at a time.
Torque Specification: Head Stud11mm ARP 200011mm ARP 625
Step 150 ft/lb50 ft/lb
Step 268 ft/lb72 ft/lb
Step 385 ft/lb95 ft/lb
Torque Specification: M6 Outer Bolts11mm ARP 200011mm ARP 625
Step 110 ft/lb10 ft/lb
Caution

On final torque go over the pattern a total of (3) times.

  1. Step 11

    Reinstall the camshafts and camshaft carriers. Snug up the camshaft carriers. Install cam shaft timing plate back into the camshafts. Verify TDC mark on the flywheel making sure the engine is still timed. Install the intake sprocket back onto the intake camshaft. Make sure your sharpie marks align properly. Apply red Loctite to the sprocket hardware and torque camshaft sprocket to 14 ft/lb. Reinstall the outer camshaft carrier and chain guide. Torque all camshaft carrier bolts to 7 ft/lb.

    Make sure your sharpie marks align properly.
  2. Step 12

    Remove the spring retainer bolt out of the spring tensioner and push the adjuster all the way in. Install the cam chain tensioner into the block and torque the mounting bolts to 7 ft/lb. Install the tensioner spring, washer and retainer bolt. Torque spring tensioner bolt to 12 ft/lb.

    Remove the spring retainer bolt out of the spring tensioner and push the adjuster all the way in.
  3. Step 13

    Rotate the crankshaft two full revolutions to verify camshaft timing.

  4. Step 14

    Reinstall the valve cover gasket, place a silicone based liquid gasket around the two lobes before installing. Place the valve cover over the camshafts and torque (4) valve cover screws to 7 ft/lb.

  5. Step 15

    Remove the spark plugs and install supplied EVP spark plugs. EVP gapped plugs are .016-.018”. Torque plugs to 9 ft/lb.

Procedure

Map Sensor Installation

  1. Step 1

    Remove the OEM MAP sensor from the plenum. Disconnect from the wiring harness. Install the supplied 4 bar MAP sensor into the plenum. If it doesn’t align properly to the threads, remove the insert from the sensor. Apply dielectric grease to the MAP sensor O-ring. Install the new MAP sensor and supplied wiring harness. Connect wiring harness back into the OEM plug.

    Remove the OEM MAP sensor from the plenum.
    Insert removed from MAP sensor
    Install the new MAP sensor and supplied wiring harness.
    Note

    we have seen misalignment with threads.

Procedure

Charge Tube & V-Flow Installation

  1. Step 1

    Install the supplied 4 bar MAP sensor into the charge tube. Apply dielectric grease to the O-ring for installation. Use suppled M5 screw to fasten down MAP sensor. Install the charge tube onto the turbocharger and throttle body. Reuse OEM hardware, use an 11mm deep well socket. Install EVP blow off valve or boost recirculation valve. Run supplied vacuum hose back to the plenum barb and “T” into the OEM hose.

    Install the supplied 4 bar MAP sensor into the charge tube.
  2. Step 2

    Before installing the EVP V-Flow its easier to block off the crankcase vent and boost recirculating valve ports before installation. If you aren’t running a catch can or blow off valve you can keep the ports open. Install the V-Flow onto the turbocharger and air box. Tighten down with a 11mm socket. Reinstall the OEM MAF sensor in the stock location.

    Before installing the EVP V-Flow its easier to block off the crankcase vent and boost recirculating valve ports before installation.
    Reinstall the OEM MAF sensor in the stock location.

Procedure

Fuel Pump Installation

  1. Step 1

    Remove the OEM fuel pump assembly out of your vehicle. It will be located underneath the passenger seat (back passenger seat if 4-seater). DO NOT break the green/blue safety clips holding the fuel lines on. It is easiest to remove the fuel pump assembly nut with EVP tool (953RU0305).

    XP Turbo/S OEM Assy
    Pro XP/Turbo R OEM Assy
  2. Step 2

    Remove the float sending unit from the OEM fuel pump. On the XP Turbo/S assembly use a small screwdriver to push the black clip inward, push the sending unit upward. On a Pro XP/Turbo R use a small screwdriver and push the sending unit downward. Remove.

    Remove the float sending unit from the OEM fuel pump.
    Remove the float sending unit from the OEM fuel pump.
  3. Step 3

    Cut (3) hoses attached to the fuel hat. (2) white hoses are supports and (1) hose is for the fuel pump. If there is a pitch clamp, remove that as well. On the Pro XP/Turbo R assembly you will NOT reuse the spring.

    Cut (3) hoses attached to the fuel hat.
    Cut (3) hoses attached to the fuel hat.
  4. Step 4

    Remove the positive and ground wire from the pump. You can now remove the OEM fuel hat assembly from the fuel pump.

    Remove the positive and ground wire from the pump.
  5. Step 5

    Cut the OEM power and ground terminals off from the fuel hat. Measure how much wire you will need to cut off the supplied pig tail connector.

    Cut the OEM power and ground terminals off from the fuel hat.
  6. Step 6

    Cut the supplied heat shrink in half, you should only need 1” per wire. Slide heat shrink onto each wire. Solder black to black and red to red.

    Cut the supplied heat shrink in half, you should only need 1” per wire.
    Solder black to black and red to red.
  7. Step 7

    Connect the solder connector to the pump. It will click once installed all the way. Install the supplied 13.3mm pinch clamp onto the fuel pump hose. If XP Turbo/S assembly, you will need to heat up all (3) hoses equally until they look shiny (DO NOT OVER HEAT). (If Pro XP/Turbo R assembly, you can install the black corrugated fuel hose first with a 13.3mm pinch clamp and install the supports together.) Once all (3) hoses are heated install the fuel hat barbs onto the white hoses. Make sure the float wires are in between both support hoses, they will lay in the half moon on the surge tank. MAKE SURE all (3) hoses are pressed on all the way!

    Install these tabs onto the hoses, in the correct orientation. Heat these hoses up with a heat gun. They should look shiny when heated correctly.
    Install these tabs onto the hoses, in the correct orientation. Heat these hoses up with a heat gun. They should look shiny when heated correctly.
    XP Turbo/S Assembly
    Pro XP/Turbo R Assembly

Procedure

Installing the EVP Surge Tank Assembly

  1. Step 1

    Double check all hoses, clamps, float, and wiring harness before installing. Make sure to reuse the OEM circle gasket between the fuel hat and fuel tank.

  2. Step 2

    Always install the fuel float first and fuel sock second. You can also remove the float arm from the assembly and install into the tank. Install the surge tank into the fuel tank about 2.0”. Then reinstall the float arm to the float assembly. See below.

    Always install the fuel float first and fuel sock second.
    Always install the fuel float first and fuel sock second.
    Always install the fuel float first and fuel sock second.
  3. Step 3

    Install the O-ring gasket between the fuel tank and fuel hat. Install the fuel pump nut and keep the same orientation if it is a XP Turbo/S model. If a Pro XP/Turbo R you will flip the fuel hat orientation 180-degrees. This will allow your float to read properly. You may need to clock your fuel line in the OEM holder.

    Pro XP/Turbo R Assembly Orientation
  4. Step 4

    Locate your fuse box (underneath steering wheel). Remove the fuel pump fuse and install supplied 20amp fuse.

    Locate your fuse box (underneath steering wheel).
  5. Step 5

    Test the fuel pump by turning on the key and listen for the pump to activate. Do this several times to prime the fuel system. Check for leaks. If there are no leaks, re-install the access cover and passenger seat.

Setup

Clutching P43 280 Kits

  • Clutching for 280 kits must be adjusted for an 8600-8800 RPM shift out.
  • Running a 91-octane tune clutching must be adjusted for 8500 RPM shift out.

Setup

MaptunerX / CodeShooter

Now that your Paragon turbocharger kit is install, you need to flash your ECU before starting the vehicle. Make sure the proper fuel is in your vehicle before starting it. If you have already contacted your sales representative and have a big turbo file, please follow the step-by-step MaptunerX or CodeShooter instructions found on our website.

Setup

Launch Control (optional)

If Launch Control has been purchased as part of this kit, your clutching engagement RPMs MUST be raised to at least your chosen engagement. This kit has launch files for 2400, 2600, 2800, 3000, and 3200 RPMs.

When you’re done

After installation

Caution

Before initial startup, unplug the injector connectors and remove the oil drain tube from the turbocharger. Turn the car over 10seconds until you see oil coming from the drainpipe on the turbocharger. This will ensure the turbocharger is oiled before start up. All EVP turbochargers come pre-oiled this is another precaution step.

Emissions notice. This product is exempt from the emission standards and related requirements of 40 C.F.R. § 1051 as provided by 40 C.F.R. § 1051.620, and California law [e.g., vehicle code §§ 27156 and 38391]. This product is sold only for use in connection with EPA certified, purpose-built, nonroad vehicles used solely for closed course, nonroad competition/racing and not used for any recreational purpose or on public highways or right of ways maintained by and open to the public. This product is sold only in connection with machines that do not fall under state and/or federal noise or emission standards/regulations. Purchasers who/that purchase this product represent and warrant that the product is purchased only in connection with EPA-certified, emission-regulations-exempt and noise-regulations-exempt competition/racing vehicles as interpreted under applicable state and/or federal law.

Need technical support?

Submit a ticket with your vehicle and what you're seeing, and our support team will get back to you.

Contact Support
We use cookies to improve your experience on our website. Read about how we use cookies in our Privacy Policy. By browsing this website, you agree to our use of cookies. privacy policy
accept

Your cart

×
×