In the box
Parts and tools
- Step 1
Remove push-darts from bottom of the bed. Remove 6 bolts going down through bed, Remove 8 push-darts holding front panel of bed in place.
- Step 2
Remove the 4 clamps holding charge tubes to the intercooler, throttle body and supercharger.
- Step 3
Insert 1.0” plug into EVP charge tube and 25-40mm worm drive clamp. Install new charge tubes and tighten until spring is fully compressed on T-bolt clamps.
Emissions notice. This product is exempt from the emission standards and related requirements of 40 C.F.R. § 1051 as provided by 40 C.F.R. § 1051.620, and California law [e.g., vehicle code §§ 27156 and 38391]. This product is sold only for use in connection with EPA certified, purpose-built, nonroad vehicles used solely for closed course, nonroad competition/racing and not used for any recreational purpose or on public highways or right of ways maintained by and open to the public. This product is sold only in connection with machines that do not fall under state and/or federal noise or emission standards/regulations. Purchasers who/that purchase this product represent and warrant that the product is purchased only in connection with EPA-certified, emission-regulations-exempt and noise-regulations-exempt competition/racing vehicles as interpreted under applicable state and/or federal law.
SKU 1532030001, 1532030002; 1532030001 (Black), 1532030002 (Green); 100FP0245, 100FP0246